As a first step, Impex Aurora S.R.L. carried out the preparation of the work area. The top layer of the site was removed using heavy machinery. The area was "fenced in" as they say in Szeklerland. Temporary site buildings were installed, and the mandatory information boards were set up. As weather permits in the Ciuc Basin, we move forward.